Pacific stair corporation s 200 series checker plate stair system is used in conjunction with checker plate landings.
Steel stair connection details.
Specify all the different types of materials.
Typical stair connections bp vb stair to intermediate platform conn.
Bolts are for alignment purposes only.
R9 collar tie at rafter detail r10 rafter brace connection detail r11 roof framing with wood tail extension r12 wood truss bearing on steel wall r13 collector block detail r14 non aligned roof wall framing r15 hip beam miscellaneous.
Stud a vertical cylindrical bar of steel with a larger cylindrical cap fastened to metal decking used to form a mechanical connection between the metal decking and the poured in place concrete slab such that the two form a composite structural element.
M1 cabinet blocking detail m2 wiring and piping installation detail m3 stair framing m4 stair framing m5 stair.
How to draw a detailed stair plan.
Indicate all the dimensions like tread widths depths total length width of the stair balustrade details etc.
R 3 16 diamond plate steel deck.
Design changes may be required depending on your projects region.
11 7 3 1 0 1 8 stringer to platform typ.
Ladders chutes grating stairs catwalks handrails or ornamental metal.
Stair must be welded to platform after install.
Pacific stair corporation cad details metal stairs the pacific stair corporation cad details below are complete drawings that can easily be downloaded customized for your residential or commercial project and included in your cad library for future use.
Weld to purlins 6x8 2steel channel purlins at 1 0 o c.
The top dog leg to nosing point height is the distance from the top nosing point to the top of steel of the top dog leg.
The information available here offers architects engineers general contractors installers and students general guidelines for steel stair egress systems.
2 x2 x1 8 steel support angle cont.
Typical e70xxelect x q r2 0 2x pl 1 4 x3 mc12x10 6 stair to intermediate platform typical connection 1 4 closure pl.
The information and details provided here are designed to meet the 2015 international building code ibc.
Mar 24 2015 stairs connection wood metal detail open riser hang.
Number each of the steps starting from the lowest 2.
1 1 2 11 2 1 1 2.